Pre-handover inspection reports
Before you take over the building or approve a milestone, get an independent inspection from a partner inspection company: category checklists, findings with severity and photos stamped with time and position, a report attached to the project and milestone, and follow-up until the contractor closes the findings.
Available · price quoted per request
- Independent inspection by a partner company
- Findings with severity and verified photos
- PDF report with a QR code and findings closed with evidence
How do inspection reports work?
From the «Inspection reports» tab inside your project, in five steps.
Request a quote
The owner, consultant or a contractor requests an inspection of the project or a milestone, picks the scope, enters the site contact and attaches the drawings.
Quote and payment
You get a VAT-inclusive price after Ataam reviews the request; after your transfer Ataam confirms the payment and issues a tax invoice to your company.
An independent inspector visits
Ataam assigns a partner inspection company or an inspector, who visits the site, fills the checklists and records findings with photos stamped with time and position.
Review and issue the report
The Ataam team reviews the draft (quality assurance), then issues the report, attaches it to the project and milestone and notifies every party.
Close the findings
Findings are assigned to the contractor with due dates by severity; the contractor uploads fix photos, the owner or consultant verifies and closes them, with a re-inspection when needed.
What is inspected?
Choose one or more scopes, or a full handover.
Structure
Columns, beams, slabs, concrete, walls and stairs, with measurements of cracks and deviations.
Waterproofing and insulation
Roof, wet-area and basement waterproofing, thermal insulation, dampness and leaks.
MEP
Plumbing, drainage and fixtures, and electrical boards, points, earthing, low current and HVAC.
Finishes, doors and windows
Paint, flooring, ceilings, tiles, joinery, doors, windows and glazing.
Safety
Fire exits and alarms, railings and barriers, and site housekeeping.
What is in the report?
Findings with severity
Each finding is critical, major or minor, with its location, measurement, the inspector's recommendation and photos.
Watermarked photos
Photos carry Ataam's watermark with the time and position they were taken.
A bilingual PDF report
In Arabic and English, with the inspection company's name next to Ataam's identity and a QR code that opens the verification page.
Milestone approval rule (optional)
The project owner can require a report without open critical findings before any milestone is approved.
Who is it for?
Owners and developers
Take over your building with an independent report instead of relying on the executing party alone.
Consultants
Back your milestone approvals with a verified independent inspection.
Contractors
Find the findings before the final handover and close them with evidence in front of the owner.
Ataam is the intermediary; the report is the inspector's opinion
The inspection is carried out by an independent party (a partner company or an Ataam inspector); Ataam connects the parties with it and only follows the quality of the report. The report reflects the inspector's opinion at the time of the visit and is not a guarantee, a structural certificate or an engineering approval of the building, and it does not replace the licensed engineering office or official requirements.
Frequently asked questions
Who carries out the inspection?
An independent inspection party: a partner inspection company of Ataam or an Ataam inspector. Ataam is the intermediary that connects the parties with it and reviews the report's quality before it is issued.
How much does an inspection report cost?
The price is set after reviewing the request according to the scope, area and location. Press «Request a quote» in the dashboard and you receive the VAT-inclusive quote before any payment; nobody else sees it.
Who can request an inspection?
A company manager of the owner, consultant or a contractor party of the project. Every project party sees the report once issued; the price and invoice stay with the requesting company.
Is the report a structural certificate?
No. It is the opinion of an independent inspection party at the time of the visit and does not replace the licensed engineering office or official requirements.
How are findings closed?
They are assigned to the contractor with due dates by severity (critical 7 days, major 14, minor 30); the contractor uploads fix photos, and the owner or consultant verifies and closes them or reopens them with a reason. A re-inspection can be requested for formal verification.
Can a milestone be blocked until it is inspected?
Yes, with an optional per-project switch: a milestone is approved only after a report issued for it with no open critical findings.